Petroleum Engineers

 
Home | Petroleum engineering other to | Petroleum exploration engineer | Petroleum production engineeri
  Position:HOME>Petroleum refining engineering>Article Content
Micro piles
Source:Internet Author:Unknow Pubdate:2008-03-22  
eaglebirdie (Civil/Environme) 14 Feb 04 20:58
Looking for information regarding micro piles

LHA (Civil/Environme) 16 Feb 04 6:53
OK, I'll be the unenlightened one...

What is a micropile?

cvg (Civil/Environme) 9 Mar 04 13:30
suggest you post this in one of the geotechnical engineers forums to get a better response

harney (Geotechnical) 21 Apr 04 0:11
Check out "Micropile Design and Construction Guidelines Implementation Manual" by Tom A. Armour, PE, Paul Groneck, PE, James Keeley, PE, and Sunil Sharma.  It's an FHWA publication, available through them or (more easily) through ADSC-IAFD (Int'l Association of Foundation Drilling) for $50.  This is currently "the" design manual for these systems.   字串6

ADSC Website (publications):
http://www.adsc-iafd.com/pubs-tech-earth.html

Focht3 (Geotechnical) 29 Apr 04 20:05
What will you use the micropiles to support?  There are issues with joint strength when subjected to flexure (i.e. lateral loading.)  The effective EI is severely impaired by the threaded connections -

Please see FAQ731-376 for great suggestions on how to make the best use of Eng-Tips Fora.  See FAQ158-922 for recommendations regarding the question, "How Do You Evaluate Fill Settlement Beneath Structures?"


(Click:

Previous:Silt control within river   Next:Experience with Flexterra or other FGMs
[Add TO Favorites] [TOP] [PRINT] [CLOCE WINDOWS]  
  Hot Article
·auto ignition temperature
·What is a flatolet?
·Material selection for higher
·ASTM D 1160 to TBP conversion
·High TAN Crudes
·what is "thermosyphon&quo
·Kinematic Viscosity and Densit
·Nelson complexity index
·Pyrophoric Iron sulfide
·Nelson Farrar refinery cost in
·Good refining literature
·Simulation softwares
  Related Articles
·Experience with Flexterra or o
·Testing of Erosion Control Pro
·Urine without water flushing a
·Tendering Criteria
·Manning roughness coefficients
·erosion control products effec
·constructing ditches
·soil erosion control
·hydroseeding steep slope
·Scour Potential near a Spillwa
·Combatting Erosion
·Erosion and Sediment Control f
Power by DedeCms