Unloading/Loading Rack Terminology
Source:Internet Author:Unknow Pubdate:2008-04-15  
chicopee (Mechanical) 15 Mar 07 21:09
Part 112- Oil Pollution Prevention section section 112(h)Facility.......Loading/Unloading Rack-
The facility has both top loading(swivelled line and dip tube) and bottom loading station.  The tanks are all independent from each other, by three-way valving. Is the top loading portion of that station still known as a loading rack eventho the tanks are not racked?  Without identifying individuals in official position,it was stated that such station do not have to have secondary containment for the trucks loading and unloading if the tanks are not racked- or are we dealing with two different terms.


(Click:

Previous:Earthen dike liners   Next:material resistance
[Add TO Favorites] [TOP] [PRINT] [CLOCE WINDOWS]  
  Hot Article
·Bulk Modulus for Jet A Fuel
·ASME B16.48 Steel Line Blanks
·Compressibility value of Jet A
·Modelling and simulation of ga
·Are there different grades of
·natural gas vs fuel oil
·Bulk Modulus of 98% Sulphuric
·Gas well testing training
·jet fuel specific heat vs. den
·Crude oil velocity in pipeline
·API 650 - Weld Spacing
·Pipe & Fittings
  Related Articles
·material resistance
·Modelling and simulation of ga
·2 Phase Flow Spreadsheet
·Weight of heavy fuel oil
·Norsok M630 castings
·ASME B16.48 Steel Line Blanks
·astm 234
·barium scale
·impeller material for use with
·Pump manufacturers for small (
·automated air wrench for open
·Physiacl Properties Aviation F
Power by DedeCms